Serving Hotel Centre Point

"VANAMATI", NAGPUR

Serving Hotel Center Point

This is how we changed whole power supply at Hotel Centre Point

Did you ever thought what kind of challenges did we faced tocreate a new model of providing power at Hotel Center Point

During the hard time of Quarantine every one was facing difficulties in many aspects of their lives the most major was financial complication.
So as hotel taj also was facing something like that and they visited us to make go solar & energy so as it would be going to save a lot of capital for them and it would be also providing some financial relief during the times.

As per other projects it was quiet challenging for our team. It was not only to install solar during this times when labour was a problem but also not disturbing their staff while they were working for their customers.It was just like to not disturb the staff but also to install whole solar panel without
disturbing the customers but also so had to think accordingly and create system for them. If was not so similar like other projects here
situation was different 

Now it was the time to go for execution process.
Look How we executed this amazing.

First of all we gathered all of the local manforce with our technical staff we did that it was even challenging for us.
but after going through all out contacts we met new people who were right for job.


Then also had to keep in mind that we have to work without making any sort of disturbance to the client of the hotel
So, we started working at the day time so to blend the noise of our instrument with the area around

Look how we completed with all the work of Project.

We saved a lot of cost of electricity cost of our client and we saved a lot of power bill. We saved 9.2 Lakhs of electricity of the company so as to make we also made electricity at night by going solar with hybrid battery.

87% of electricity cost is been reduced now. Now we are looking forward to go solar at different city branches of the hotel.

About Project

We required 54kwt solar Panels for the installation at hotel.

The number of 34 people were required for project.

Three solar modules

One photocell

One pole with mounting structures

Results of projects

We save more over power bills with satisfaction

Promoted Solar even in Hotels

We save more over power bills with satisfaction

Promoted Solar even in Hotels

Last Projects

Taj Hotel

We helped the hotel Taj, in taking the conscious initiative to reduce their carbon footprint & utility costs.

Kingsway Hospital

Going solar has enabled the healthcare giant to access an uninterrupted supply of green electricity.

Hotel Centre Point

Switched from electric power to 100% solar-powered green hotelier.

Save Upto 75%

on your electricity

Need Help?